Installation of a track
ÔÚ¿ìËÙ¾íÁ±ÃŵÄÁ½²àÈ·¶¨µ¼¹ì×°ÖÃλÖã¬Óô¸Ï߷ųöµ¼¹ì»ù×¼Ïߣ¬·Å³öµ¼¹ìÁ¬½Ó¼þÀιÌÂÝ˨ʮ×ÖÏߣ¬µ¼¹ìÁè¼Ýµõ*²»Ð¡ÓÚ75cm¡£
Determine the installation position of the guide rail on both sides of the quick rolling shutter door, use a hammer line to set out the reference line of the guide rail, and set out the cross line of the fixing bolt of the guide rail connection. The guide rail should exceed the hanging height by no less than 75cm.
Óù¥»÷×êÔÚǽÖùÉÏ´ò³öÁ¬½Ó¼þÀιÌÅòÕÍÂÝ˨¿×£¬Á¬½Ó¼þµÄ¼ä¾à²»¿ÉÒÔ´óÓÚ600mm£¬²¢ÇÒ£¬Á½¶Ë¾àµ¼¹ì¿Ú100mm¡£ÏÈÉÏÏÂÀι̼¸¿éÁ¬½Ó¼þ£¬½«Æäµ¼¹ìÌùÉÏ£¬Ð£ÕýÆä±ÊÖ±²¢µãº¸£¬µ¼¹ìÀι̺óÔÚ¸´ºÏÁ±Ò»Ïµ¼¹ìµÄ±ÊÖ±¶È£¬Ã¿Ãײ»µÃ´óÓÚ5mm£¬È«³¤±ÊÖ±¶È²»µÃÁè¼Ý20mm£¬¸´ºÏÁ±ÃæǶÈëµ¼¹ìÉî¶È(¼ûGBl4102¡ª2005)¡£
Use an impact drill to drill the expansion bolt holes for fixing the connectors on the wall column. The spacing between the connectors should not exceed 600mm, and both ends should be 100mm away from the guide rail opening. Firstly, fix several connecting pieces up and down, attach their guide rails, correct their verticality, and spot weld them. After the guide rails are fixed, the verticality of the guide rails below the composite curtain should not exceed 5mm per meter, and the full length verticality should not exceed 20mm. The depth of the composite curtain surface embedded in the guide rails (see GBl4102-2005).
½«ÆäÓàÁ¬½Ó¼þ×°ÉÏ£¬Á¬½Ó¼þÓëµ¼¹ìÖ®ÎʽÓÄɵ㺸£¬Ã¿¼þÁ¬½Ó¼þÓëÒ»µ¼¹ì¼äµãº¸µã²»ÉÙÓÚ5µã£¬µãº¸µÄ¿í¶È²»Ð¡ÓÚ5mm£¬º¸½Ó´¦¾ø²»Ó¦´©ÏÖÏ󱬷¢¡£½ÓÄɲ»Ðâ¸Öµ¼¹ìʱº¸Ìõ½ÓÄɲ»Ðâ¸Öº¸Ìõ¡£
Install the remaining connecting pieces, and use spot welding between the connecting pieces and the guide rail. There should be no less than 5 spot welding points between each connecting piece and one guide rail, and the width of the spot welding should not be less than 5mm. The welding should never be penetrated. When using stainless steel guide rails, stainless steel welding rods are used.
¶þ¿ìËÙ¾íÁ±ÃÅ´óÖáµÄ×°ÖÃ
Installation of the main shaft of the second fast rolling shutter door
¿ìËÙ¾íÁ±ÃÅ´óÖá×°ÖÃÇ°£¬ÏȽ«¹Ò°å¶¨ºÃÆ«Ïò×°µ½¾íÖáÉÏ£¬ÔÙ°Ñ4-6ƬÁ±°å×°µ½¹Ò°åÉϲ¢¾í½ôÔÚ¾íÖáÉÏ´¨ÌúË¿ÔúÀΡ£
Before installing the main shaft of the fast rolling shutter door, first orient the hanging plate onto the rolling shaft, and then install 4-6 curtain plates onto the hanging plate and tighten them onto the rolling shaft with Sichuan iron wire.
µõ×°¿ìËÙ¾íÁ±ÃÅ´óÖᣬһ¶¨Òª×¢Òâ¡£°²ÅÅÖ¸»ÓÈË×ÖÌݽÅÊÖ¼ÜÊÖÀºù«¶¼Òª¾¹ý¼ì²é¡£¿ìËÙ¾íÁ±ÃÅ×°ÖÃʱÏȽ«Ì×ÉÏÖá³Ð¼°×ùµÄ¹âÖáÈûÈë¾íÖá¶Ë¿×ÖУ¬Ãé׼λÖúó½«Öá³ÐÀιÌÂÝ˨š½ô¡£
When lifting the large shaft of the fast rolling shutter door, it is necessary to pay attention to safety. The arrangement of command ladder, scaffolding, and chain hoists must be inspected. When installing the fast rolling shutter door, first insert the optical shaft with the bearing and seat into the end hole of the rolling shaft, align it with the position, and then tighten the bearing fixing bolts.
¾íÖáÉϺú󣬿É×óÓÒÒƶ¯¾íͲµ÷ÀíλÖá£Í¬Ê±£¬ÓÃˮƽ³ßºÍˮƽ¹Ü¸´ºËһϾíÖáµÄˮƽ¡£µ÷½âºÃºó£¬¹âÖáÓë¾íÖáÂúº¸Àι̣¬¹âÖáÓëÖá³ÐÓÃ֧ͷÂݶ¤Àι̡£
After the reel is installed, the reel can be moved left and right to adjust its position. At the same time, double check the level of the scroll with a level ruler and a horizontal tube. After adjustment, the optical shaft and the rolling shaft are fully welded and fixed, and the optical shaft and bearing are fixed with support screws.
¾íÖáµõװʱҪÌرð×¢Òâ²»ÒªÅö»µ¾íÔÚÖáÉϵÄÁ±°å£¬ÓøÖË¿ÉþÀ¦ÔúʱҪµæľ°å¡£
When hoisting the reel, special attention should be paid not to damage the curtain board rolled on the reel, and wooden boards should be used when tying with steel wire ropes.
±¾ÎÄÓɼÃÄϾíÁ±ÃÅΪÄúÌṩ£¬ÎÒÃǵÄÍøÕ¾ÊÇ:½«ÒÔÈ«ÐÄÈ«ÒâµÄÈÈÇéΪÄúÌṩЧÀÍ£¬½Ó´ýÄúµÄ»á¼û£¡
This article is provided by Jinan Rolling Shutter Door. Our website is: We will provide you with wholehearted enthusiasm and welcome your visit!
ÔĶÁ/ Recommended reading
- ¼ÃÄϾíÁ±ÃŵÄÓŵãÆÊÎö 2024-12-16
- ¼ÃÄϾíÁ±ÃŵÄ×°ÖÃÖ¸ÄÏ£º°ì·¨Óë×¢ÒâÊÂÏî 2024-12-11
- ¼ÃÄϾíÁ±ÃŵÄάÐÞ±£Ñø£ºÑÓ³¤Ê¹ÓÃÊÙÃüµÄÒªº¦ 2024-12-09
- ¼ÃÄϾíÁ±ÃÅ£º¾íÁ±ÃÅÒ£¿ØÆ÷ʧÁéʱÊÔÊÔ±¾ÎĵÄÒªÁì°É£¡ 2024-11-16
- µç¶¯¾íÁ±ÃŵÄÓÅÊÆ 2024-11-12
- ¼ÃÄϾíÁ±ÃÅ£º¾íÁ±ÃÅÒ£¿ØÆ÷ʧÁéÔõô°ì£¿ 2024-09-02
- ¼ÃÄϾíÁ±Ãų§£º¾íÁ±ÃÅ¿¨Ö÷ÁËÔõô°ì 2024-08-28
- ¼ÃÄϵ綯¾íÁ±ÃÅ£ºµç¶¯¾íÕ¢ÃÅûµçÁËÔõô¿ª? 2024-08-28
¡¡¡¡³µ¿â¾íÁ±ÃÅÔÚʹÓÃÀú³ÌÖпÉÄÜ»áÓöµ½ÖÖÖÖ¹ÊÕÏ£¬ÒÔÏÂÊÇһЩ³£¼ûµÄ¹ÊÕϼ°ÆäάÐÞÒªÁ죺¡¡¡¡Garage rolling shutter doors may encounter vario...